Single-side Bracket



With the limit of the construction site and the development of slope protecting technology, there are more and more single side walls, which bring much trouble to contractor as through-wall tie-rod is not allowed.
Based on the technology of some foreign formwork companies, we developed the Single-side Bracket.The single-side formwork system is easy to operate and is specially used in the single-side wall, which is a good option in the underground work in the narrow city area.
Advantag
The construction is easy and fast, there is less anchor and the stress is reasonable.
the short concrete reinforced bars can also be used.The pouring height is adjustable.
the Max. height of one pouring is 8.4m.
The components have good standard performance and versatility.
The body bracket can be sorted into four types according to the height: standard frame H=3800mm, heighten frame H=500mm, heighten frame H=1800mm, and heighten frame H=2200mm.


Our single-side bracket is very strong, low-cost, easy and safe to operate. On the base of certain operating room, the Single-side Bracket can be used in any single-side wall formwork, including outside wall of basement, the sewage dealing factory, slops of the roads and bridges and so on. Usually, an operating room of 3.7m width is needed for the highest Single-side Bracket.

Single-side bracket is the supporting system of the Single-side Formwork. There is no necessary to set wall-through bolts when single-side bracket is used.
A high-tension bolt is used to fix the bracket, forming a 45。angle with the ground. One end of high-tension bolt is connected with the anchors and the other is connected with the single-side bracket. The force from the high-tension is divided into two, one is vertical and the other is horizontal. Both the two forces are balanced by the force generated by the bracket, fixing the bracket steadily.
以某一工程为例:该工程地下三层,层高5.6米,外墙400延长米,护坡桩护坡,分四个流水,计划120天完成,同分别按双面模板和单面模板做成本分析: 外墙采用双面模板做法(100天完工)
外墙采用双面模板做法(100天完工)
外墙用单面模板做法(50天完工)

Using the Single-side Wall Formwork can highly reduce the difficulty of the slope-protection.The constructing site is much smaller.Much earthwork working is saved.Inconvenience of construction is never occurred, even working space is not enough.
1.One side of wall formwork and the outside scaffolding are saved.
2.Waterproof wall-through bolts are saved (while using double formwork in the basement,
3.the waterproof wall-through bolts are one-off and cannot be used repeatedly).
4.Whit a fast constructing speed, much time is saved.
Based on a lot of construction experience both at home and abroad, we advise the right sketch.
ADDRESS:Room 1906, Jianchen Building, South Business District, Yinzhou District, Ningbo, Zhejiang, China
TEL:+86-574-5522 6683 FAX:+86-574-5522 6684 EMAIL:sales1@nb-luowen.com